5th Avenue & Poplar Street Upcoming Traffic Signal Changes 

SHARE NOW

HUTCHINSON, Kan. – Beginning December 7th, 2026, the City of Hutchinson will begin the phased removal of the traffic signal located at 5th Avenue & Poplar Street. As the first step, signal heads will be covered (bagged) to deactivate the lights.

The covered signals will remain in place for a minimum of 90 days. During this transition, the City will monitor traffic conditions and safety. Full removal of the signal poles is scheduled for March 2027.

Why Are These Signals Being Removed?

Following a recent traffic engineering evaluation, the City determined that these signals are no longer warranted based on current traffic volumes, safety considerations, and national standards. Removing unwarranted traffic signals is a proven approach that improves safety and reduces costs while maintaining effective traffic control through alternative methods such as stop signs.

Cost Savings and Infrastructure Avoidance

Removing these outdated signals will result in immediate operational savings and significant long-term cost avoidance:

Estimated Annual Operational Savings:

  • Electricity Costs: $800.00
  • Maintenance Task Costs: $700.00
  • Total Estimated Annual Savings: $1,500.00

Avoided Intersection Update Costs:

Due to aging infrastructure, this intersection would require substantial upgrades to remain operational. By removing the signals, the City avoids the following estimated expenses:

  • Estimated Total Upgrade Cost (Including Signal Poles): $305,039.00

Safety and Efficiency Improvements

In areas with low traffic volume, traffic signals can cause unnecessary delays, increase driver frustration, and contribute to rear-end collisions. Replacing signals with stop signs or other appropriate controls helps reduce these risks and improve overall traffic flow.

Next Steps

During the 90-day signal shutdown, we will closely monitor these intersections to ensure the effectiveness and safety of the new traffic control measures. We appreciate the public’s cooperation and attentiveness as these improvements are implemented.